Design

Halliday Fraser Munro Logo
Morrison Construction Logo

Throughout the design process, the Moray Sports Foundation Team have actively sought Community feedback to gauge what will be provided at the Centre.

 

Hosting community consultations, attending forums with key stakeholders and regular steering group meetings, we have used the feedback to encourage HFM architects, Aberdeen to design a very modern building.  A great amount of focus was given to the layout the centre, specifically, the design needs to be welcoming, functional, easily navigated, and above all else accessible to all.

 

Community-led design

Taking account of community surveys, interviews with sports clubs and governing bodies, the needs of Moray Council, Moray College and local health and social care services, and the advice of SportScotland.

Over 300 people attended public consultations and many more viewing designs online and in the press.

 

A tendering process identified Morrison Construction as the preferred contractor. The final design was unveiled at a public meeting in July 2016, one year after the initial public announcement. Subject to raising the capital, phase one of the build will take around 50 weeks.

8 Badminton Court

Sports hall. A huge multi-use space capable of hosting a wide variety of activities with bleacher seating for viewing games and events. 

Restaurant serving healthy and locally sourced food.

Soft play and parents area as soon as you come in the door.

Adult lounge area.

Specialist 'Changing Places' toilet facility.

Ground Floor

First Floor

Gym with an extensive range of equipment.

Low intensity/ Holistic activity studio eg.

Yoga, Pilates, Ballet etc.

High intensity activity studio eg.

Aerobics, Circuit Training, Bootcamp etc. 

Coach Hub for committee meetings & resources.

Meeting rooms which can be turned into 1 large conference room.

Indoor cycling studio.

Therapy Rooms.

Outside Area

Children's Outdoor play area.

Four covered Tennis Courts.

Outdoor exercise equipment.

100m running track

with long jump.

Outdoor Pitches.

1km sensory running and walking track.

Quiet Garden.

The priority facilities for the phase one of the sports centre include:

  • Car park and bike shelter – we need to enable you to get to the facility

  • Reception, staff room and support offices – we need space to run the operation

  • Restaurant and kitchen that caters for individuals, families, social gatherings and events

  • The 8 court sports hall, with capacity for 500+ spectators and supporting changing facilities

  • The gym (with private teaching area) and 3 studios (Holistic, Aerobic and Indoor Cycling), with members changing

  • Treatment rooms (available for hire)​

  • Meeting rooms

  • Sports hub library

These facilities must be operational and successful to allow us to consider future expansions. There will be phased additional facilities through the construction process subject to funds raised and community support.

Moray Sports Centre

Linkwood Road

Elgin, IV30 8AR

Tel: 01343 610 670

Email: hello@moraysportscentre.co.uk

Moray Sports Foundation
Scottish Charitable Incorporated Organisation (SCIO)
Registered Charity No.SC046059